Date of realisation: 2024-2025
Place of realization: Kechnec

Magna electronic – cleanroom

Disclaimer: This content has been automatically translated using artificial intelligence. Inaccuracies may occur.

The structure is an extension to the existing steel hall. The intention of the construction was to adapt the layout of the building to the current operational requirements. The structure was connected to the existing columns of the steel hall.

reference image reference image reference image reference image reference image reference image

Documentation level: production documentation

Dimensions of the structure: dimensions of the building 60.00 m x 30.52 m

Weight of steel structure:71.25 t

Vertical load-bearing structures: steel

Horizontal load-bearing structures: steel

Establishment: deep/flat

Share reference:
FB IN

We realized

When evaluating a potential partner in the field of building statics, it is important to look at their history of success and satisfied clients. Our company is proud of its references, which testify to our professional approach and quality work.

Subscribe
our newsletter

And stay informed about news from our world
Created by a digital agency Wink & Nod
www.bvk-pro.com © 2026