Date of realisation: 2025
Place of realization: Kvetoslavov

Reconstruction and extension of the primary school, Kvetoslavov

Disclaimer: This content has been automatically translated using artificial intelligence. Inaccuracies may occur.

NAME OF BUILDING: Reconstruction and Completion of Primary School
Place of construction: Kvetoslvov
Time of realization: 2025
Level of documentation: VPP
Dimensions of construction: 53,3 x 25,525m, 1PP + 3NP

Short description of the supporting structure:
The project assignment included the design and preparation of implementation documentation of reinforced concrete structural elements of the timber building, which include foundation structures, underground floors and reinforced concrete cores and stiffening elements on the above-ground floors. The building is founded in plan – a foundation slab is designed under the 1st floor, and foundation strips under the 1st floor. Vertical bearing system 1. PP consists of monolithic reinforced concrete walls. On the above-ground floors the load-bearing system is supplemented by monolithic reinforced concrete core walls and monolithic columns. The horizontal load-bearing system above the 1st floor and above the cores consists of monolithic reinforced concrete floor slabs.

reference image reference image reference image
Share reference:
FB IN

We realized

When evaluating a potential partner in the field of building statics, it is important to look at their history of success and satisfied clients. Our company is proud of its references, which testify to our professional approach and quality work.

Subscribe
our newsletter

And stay informed about news from our world
Created by a digital agency Wink & Nod
www.bvk-pro.com © 2026