Date of realisation: 2025-2026
Place of realization: Blue

Shelter of the house of mourning Modra – Kralov

Disclaimer: This content has been automatically translated using artificial intelligence. Inaccuracies may occur.

Place of construction: Modra
Implementation time: 2025-2026
Documentation grade: Construction project
General Designer: Maarch s.r.o.
Dimensions of the structure: 9.5 m x 9.5 m
Number of underground and above-ground floors: 1.NP
Vertical load-bearing structures: wooden columns
Horizontal load-bearing structures: Roof structure

Short description of the structure:
The shelter is designed as a combined steel-wood structure. The construction of the shelter is designed with wooden columns. The wooden columns will be driven into the foundations in the direction perpendicular to the pavement, in the direction parallel to the pavement the columns will be anchored into the foundations jointly (in this direction the stiffening of Halfen Detan system rods is proposed). The structure of the folded roof consists of steel eave trusses and a top steel truss on which wooden trusses are laid.

reference image reference image reference image reference image reference image reference image reference image reference image
Share reference:
FB IN

We realized

When evaluating a potential partner in the field of building statics, it is important to look at their history of success and satisfied clients. Our company is proud of its references, which testify to our professional approach and quality work.

Subscribe
our newsletter

And stay informed about news from our world
Created by a digital agency Wink & Nod
www.bvk-pro.com © 2026