Date of realisation: 2023-2024
Place of realization: Lusitania

Steep Plast production area – Stage 3

Disclaimer: This content has been automatically translated using artificial intelligence. Inaccuracies may occur.

The building is a detached structure, which forms 1 dilatation unit. The floor plan is L-shaped. The maximum floor plan dimensions of the structure are 67.0 m x 100.0 m. The building has one storey. The highest point of the building structure is 11.3 m from ±0.000 level.

The building provides space for production and storage areas.

BVK – PRO prepared all stages of PD for prefabricated and steel structures.

reference image reference image reference image reference image reference image reference image

Documentation grade:

Project for building permit

Project for the implementation of the construction

Production documentation of precast reinforced concrete elements

Production documentation of steel elements

Dimensions of the structure: 67.00 m x 100.00 m

Volume of prefabricated structures: 650 m3

The volume of reinforced concrete structures: 320 m3

The weight of the steel structure: 28,99 t

Share reference:
FB IN

We realized

When evaluating a potential partner in the field of building statics, it is important to look at their history of success and satisfied clients. Our company is proud of its references, which testify to our professional approach and quality work.

Subscribe
our newsletter

And stay informed about news from our world
Created by a digital agency Wink & Nod
www.bvk-pro.com © 2026