Date of realisation: 2024
Place of realization: Trnava

Warehouse of soft raw materials – modernisation of intake and dispatch

Disclaimer: This content has been automatically translated using artificial intelligence. Inaccuracies may occur.

The building is used for the storage of trucks in a closed environment and is equipped with the appropriate technology for handling soft raw materials. The intention was to replace the original, partially open building with a hopper and underground conveyor tunnel. The structure is designed in such a way that the underground part can continue to use the building structures of the original building.

reference image reference image reference image reference image reference image reference image

Vertical load-bearing structures: steel

Horizontal load-bearing structures: steel

Foundation: flat

Documentation level: production documentation

Construction dimensions: 26.82 m x 8.21 m

Weight of steel structure: 23.20 t

Share reference:
FB IN

We realized

When evaluating a potential partner in the field of building statics, it is important to look at their history of success and satisfied clients. Our company is proud of its references, which testify to our professional approach and quality work.

Subscribe
our newsletter

And stay informed about news from our world
Created by a digital agency Wink & Nod
www.bvk-pro.com © 2026