In 2020, our Steel Structures Division completed the production documentation of steel structures for the EPERIA II project – the second stage of the construction of a shopping centre in Prešov.
We prepared the workshop documentation on the basis of the implementation project, which was provided by OBERMEYER HELIKA s.r.o.
Our partner and client WINFER spol. s.r.o.
The structural model was created in Tekla Structures. The complexity of the model is evident from the large number of elements of which it is composed: 28 309 individual and 2 609 main parts. The total number of assembly drawings is 78 pieces. 16 000 screws were used in the assembly.
BVK-PRO, s.r.o. provides complexity of delivery of project solutions for the construction in terms of load-bearing structure and also for the construction of foundations under technology even in difficult geological or technological conditions. Of course, intensive mutual communication with the investor is a matter of course for us, in cooperation with all participants in the design or implementation.
Important partners for us are leading architectural firms, developers and investors, implementation and production companies, for which we process implementation projects and production documentation of load-bearing structures.
Ing. Ádám Varga
managing director of the company